AyokaCutiePie9756 AyokaCutiePie9756
  • 03-03-2020
  • Social Studies
contestada

In process​ costing, ________​ is/are found by taking the number of partially completed physical units and multiplying it by the percentage of the process completed.

Respuesta :

kendrich
kendrich kendrich
  • 04-03-2020

Answer:

D. equivalent units

Explanation:

Equivalent units can be said to be the units in production which are multiplied by the percentage of those units that are complete that is hundred percent or the units that are in process that is that is not completed yet. When a unit is completed its transferred out.

Answer Link

Otras preguntas

B is between A and C and AB = BC. If AB = 4x and AC = 24, find x.
POSSIBLE PC What is the value of |-x+ 5y] + vay when x = 12 and y = 3? A. 3 C. 16 B. 9 D. 33
Help quick pls lol I’m doing my homework and it has to be due in 5 minutes
Can someone solve Please?
what is 2+2 fjjfjfjfjfjfjfjffjfffjf fjfjfjjffjfjfjfjf
solve for h in the literal equation g (h + 2/3) = 11
hello guys again i need help with this problem , it says i need to write down this number (six hundred forty-two billion , three hundred thousand ) in standard
What is the constant in the expression 3x−7+6y ? 6 3 −7 I don't know.
Major grade please make sure it is right I will brain list it
If the numbers -2.5, -1.6, -3 1/10, - 1/10, and -0.5 were graphed on a number line, which would appear farthest to the left? A. -1.6 B. -1/10 C. -2.8 D. -3 1/1